Assessment Year | 2023 |
---|---|
Principal Product | Filters |
NAICS | 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
125,000
ft2
|
Annual Production | 4,500,000
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $62,670 | 761,333 |
kWh
|
$0.082 |
Electricity Demand | $43,804 | 1,983 |
kW-mo/yr
|
$22.09 |
Natural Gas | $43,092 | 2,862 |
MMBtu
|
$15.05 |
TOTAL YEARLY COSTS | $149,566 | |||
RECOMMENDED SAVINGS* | $97,871 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $46,339 | $196,478 |
$17,021
206,822
kWh
|
$29,318
-
kW-mo/yr
|
|
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $11,591 | $41,000 |
$11,591
140,850
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,199 | $1,500 |
$7,386
89,749
kWh
|
$3,813
-
kW-mo/yr
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,281 | $14,880 |
$5,698
69,232
kWh
|
$4,583
-
kW-mo/yr
|
|
05 | 2.4239: Eliminate or reduce compressed air usage | $9,574 | - |
$9,574
116,329
kWh
|
- | |
06 | 2.7135: Install occupancy sensors | $4,832 | $4,725 |
$2,678
32,545
kWh
|
$2,154
-
kW-mo/yr
|
|
07 | 2.7134: Use photocell controls | $4,055 | $2,500 |
$1,188
14,439
kWh
|
$2,867
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $97,871 | $261,083 |
$55,136
669,966
kWh
|
$42,735
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs