ITAC Assessment: BS0042
ITAC logo
ITAC Assessment: BS0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Heating/Cooling Coils
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 55,000
ft2
Annual Production 1,820
pieces
Production Hrs. Annual 4,188
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,882 1,193,409
kWh
Electricity Demand $27,618 4,091
kW-mo/yr
Electricity Fees $314 -
Natural Gas $37,766 4,743
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,335

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,472 $8,031 $2,059
26,061
kWh
$413
-
kW-mo/yr
-
02 2.4322: Use or replace with energy efficient substitutes $17,441 $42,000 $17,441
220,776
kWh
- -
03 2.7243: Improve air circulation with destratification fans / other methods $4,279 $17,525 $(-398.2)
(-5,040)
kWh
- $4,677
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,955 $450 $1,955
24,752
kWh
- -
05 2.6212: Turn off equipment during breaks, reduce operating time $1,973 $3,120 $1,973
24,974
kWh
- -
06 2.7491: Insulate glazing, walls, ceilings, and roofs $4,668 $9,641 - - $4,668
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,494 $175 $1,494
18,907
kWh
- -
TOTAL RECOMMENDED $34,282 $80,942 $24,524
310,430
kWh
$413
-
kW-mo/yr
$9,345
-
MMBtu
TOTAL IMPLEMENTED $25,335 $53,776 $24,922
315,470
kWh
$413
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs