Assessment Year | 2023 |
---|---|
Principal Product | Metal Finishing |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 119 |
Plant Area |
30,600
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 5,304
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $218,449 | 900,008 |
kWh
|
$0.24 | |
Electricity Demand | $87,353 | 3,140 |
kW-mo/yr
|
$27.82 | |
Natural Gas | $97,777 | 8,031 |
MMBtu
|
$12.18 | |
LPG | $11,275 | 1,000 |
MMBtu
|
$11.28 | |
Waste Disposal Costs | |||||
Water Usage | $49,420 | 8,094 |
Tgal
|
$6.11 | |
Water Disposal | $2,229 | 8,094 |
Tgal
|
$0.28 | |
TOTAL YEARLY COSTS | $466,503 | ||||
RECOMMENDED SAVINGS* | $82,270 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $2,046 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $38,200 | $16,400 |
$38,200
157,344
kWh
|
- | - | - | |
02 | 2.1224: Replace boiler | $15,803 | $9,000 | - | - |
$15,803
-
MMBtu
|
- | |
03 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $9,639 | $30,000 |
$(-1,636.0)
(-6,739)
kWh
|
- | - |
$11,275
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,840 | $300 |
$7,560
31,140
kWh
|
$1,280
-
kW-mo/yr
|
- | - | |
05 | 2.9114: Use solar heat to make electricty | $3,625 | $13,372 |
$2,651
10,920
kWh
|
$974
-
kW-mo/yr
|
- | - | |
06 | 2.3112: Store heated/ cooled water for use during peak demand periods | $2,348 | $8,100 | - |
$2,348
-
kW-mo/yr
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,483 | $99 |
$1,174
4,896
kWh
|
$309
-
kW-mo/yr
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,446 | - |
$1,140
4,697
kWh
|
$306
-
kW-mo/yr
|
- | - | |
09 | 2.6231: Utilize controls to operate equipment only when needed | $563 | $500 |
$563
2,317
kWh
|
- | - | - | |
10 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $323 | - | - |
$323
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $82,270 | $77,771 |
$49,652
204,575
kWh
|
$5,540
-
kW-mo/yr
|
$15,803
-
MMBtu
|
$11,275
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,046 | $599 |
$1,737
7,213
kWh
|
$309
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs