| Assessment Year | 2024 |
|---|---|
| Principal Product | bottled water |
| NAICS | 312112: Bottled Water Manufacturing |
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $100 M to 500M |
| # of Employees | 165 |
| Plant Area |
495,000
ft2
|
| Annual Production | 1,000,000,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,757,543 | 45,448,670 |
kWh
|
$0.039 |
| Electricity Demand | $797,435 | 64,820 |
kW-mo/yr
|
$12.30 |
| Electricity Fees | $571,710 | - |
|
- |
| Natural Gas | $80,816 | 6,329 |
MMBtu
|
$12.77 |
| TOTAL YEARLY COSTS | $3,207,503 | |||
| RECOMMENDED SAVINGS* | $249,156 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2623: Minimize condenser cooling water temperature | $14,256 | $2,000 |
$14,256
365,577
kWh
|
- | |
| 02 | 2.7226: Use computer programs to optimize hvac performance | $32,890 | $17,600 |
$22,970
588,968
kWh
|
$9,920
-
kW-mo/yr
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $20,745 | - |
$14,486
371,424
kWh
|
$6,259
-
kW-mo/yr
|
|
| 04 | 2.4226: Use / purchase optimum sized compressor | $138,413 | $947,200 |
$96,650
2,478,204
kWh
|
$41,763
-
kW-mo/yr
|
|
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,675 | - |
$15,135
388,068
kWh
|
$6,540
-
kW-mo/yr
|
|
| 06 | 2.4239: Eliminate or reduce compressed air usage | $6,947 | - |
$4,851
124,392
kWh
|
$2,096
-
kW-mo/yr
|
|
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $8,562 | $2,120 |
$5,979
153,300
kWh
|
$2,583
-
kW-mo/yr
|
|
| 08 | 2.9114: Use solar heat to make electricty | $5,668 | $93,870 |
$5,668
145,337
kWh
|
- | |
| TOTAL RECOMMENDED | $249,156 | $1,062,790 |
$179,995
4,615,270
kWh
|
$69,161
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs