ITAC Assessment: CC0040
ITAC logo
ITAC Assessment: CC0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product bottled water
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 165
Plant Area 495,000
ft2
Annual Production 1,000,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,757,543 45,448,670
kWh
Electricity Demand $797,435 64,820
kW-mo/yr
Electricity Fees $571,710 -
Natural Gas $80,816 6,329
MMBtu
TOTAL YEARLY COSTS $3,207,503
RECOMMENDED SAVINGS* $249,156 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2623: Minimize condenser cooling water temperature $14,256 $2,000 $14,256
365,577
kWh
-
02 2.7226: Use computer programs to optimize hvac performance $32,890 $17,600 $22,970
588,968
kWh
$9,920
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $20,745 - $14,486
371,424
kWh
$6,259
-
kW-mo/yr
04 2.4226: Use / purchase optimum sized compressor $138,413 $947,200 $96,650
2,478,204
kWh
$41,763
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,675 - $15,135
388,068
kWh
$6,540
-
kW-mo/yr
06 2.4239: Eliminate or reduce compressed air usage $6,947 - $4,851
124,392
kWh
$2,096
-
kW-mo/yr
07 2.7111: Reduce illumination to minimum necessary levels $8,562 $2,120 $5,979
153,300
kWh
$2,583
-
kW-mo/yr
08 2.9114: Use solar heat to make electricty $5,668 $93,870 $5,668
145,337
kWh
-
TOTAL RECOMMENDED $249,156 $1,062,790 $179,995
4,615,270
kWh
$69,161
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs