ITAC Assessment: CC0035
ITAC logo
ITAC Assessment: CC0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product bottled water
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $5
M
to 10
M
# of Employees 26
Plant Area 52,000
ft2
Annual Production 18,000
Tgal
Production Hrs. Annual 4,420
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,434 355,031
kWh
Electricity Demand $15,878 1,161
kW-mo/yr
Electricity Fees $678 -
Natural Gas $6,053 459
MMBtu
TOTAL YEARLY COSTS $59,043
RECOMMENDED SAVINGS* $34,674 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7234: Use heat pump for space conditioning $1,534 $7,000 $845
8,208
kWh
$689
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,395 $4,578 $6,156
59,769
kWh
$2,239
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,484 $1,000 $8,484
82,368
kWh
- -
04 2.2437: Recover waste heat from equipment $3,601 $4,550 - - $3,601
-
MMBtu
05 2.4226: Use / purchase optimum sized compressor $4,795 $2,800 $4,795
46,553
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $7,865 - $5,782
56,134
kWh
$2,083
-
kW-mo/yr
-
TOTAL RECOMMENDED $34,674 $19,928 $26,062
253,032
kWh
$5,011
-
kW-mo/yr
$3,601
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs