Assessment Year | 2024 |
---|---|
Principal Product | bottled water |
NAICS | 312112: Bottled Water Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $5 M to 10M |
# of Employees | 26 |
Plant Area |
52,000
ft2
|
Annual Production | 18,000
Tgal
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $36,434 | 355,031 |
kWh
|
$0.10 |
Electricity Demand | $15,878 | 1,161 |
kW-mo/yr
|
$13.67 |
Electricity Fees | $678 | - |
|
- |
Natural Gas | $6,053 | 459 |
MMBtu
|
$13.20 |
TOTAL YEARLY COSTS | $59,043 | |||
RECOMMENDED SAVINGS* | $34,674 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7234: Use heat pump for space conditioning | $1,534 | $7,000 |
$845
8,208
kWh
|
$689
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,395 | $4,578 |
$6,156
59,769
kWh
|
$2,239
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,484 | $1,000 |
$8,484
82,368
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $3,601 | $4,550 | - | - |
$3,601
-
MMBtu
|
|
05 | 2.4226: Use / purchase optimum sized compressor | $4,795 | $2,800 |
$4,795
46,553
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,865 | - |
$5,782
56,134
kWh
|
$2,083
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $34,674 | $19,928 |
$26,062
253,032
kWh
|
$5,011
-
kW-mo/yr
|
$3,601
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs