ITAC Assessment: OK0170
ITAC logo
ITAC Assessment: OK0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product LATEX CATHETERS
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area
n/a
Annual Production 5,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,853 1,599,941
kWh
Natural Gas $14,165 3,479
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,291 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,717

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $209 $300 $209
6,448
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $29 $80 $29
879
kWh
-
03 2.2511: Insulate bare equipment $365 $580 - $365
-
MMBtu
04 2.2511: Insulate bare equipment $52 $27 - $52
-
MMBtu
05 2.7226: Use computer programs to optimize hvac performance $232 $200 - $232
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,159 $946 $1,159
29,308
kWh
-
07 2.2444: Use hot process fluids to preheat incoming process fluids $245 $600 $245
7,620
kWh
-
TOTAL RECOMMENDED $2,291 $2,733 $1,642
44,255
kWh
$649
-
MMBtu
TOTAL IMPLEMENTED $1,717 $1,853 $1,433
37,807
kWh
$284
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs