Assessment Year | 1985 |
---|---|
Principal Product | LATEX CATHETERS |
NAICS |
n/a
|
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $1 M to 5M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,853 | 1,599,941 |
kWh
|
$0.046 |
Natural Gas | $14,165 | 3,479 |
MMBtu
|
$4.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $2,291 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,717 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $209 | $300 |
$209
6,448
kWh
|
- | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $29 | $80 |
$29
879
kWh
|
- | |
03 | 2.2511: Insulate bare equipment | $365 | $580 | - |
$365
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $52 | $27 | - |
$52
-
MMBtu
|
|
05 | 2.7226: Use computer programs to optimize hvac performance | $232 | $200 | - |
$232
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,159 | $946 |
$1,159
29,308
kWh
|
- | |
07 | 2.2444: Use hot process fluids to preheat incoming process fluids | $245 | $600 |
$245
7,620
kWh
|
- | |
TOTAL RECOMMENDED | $2,291 | $2,733 |
$1,642
44,255
kWh
|
$649
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,717 | $1,853 |
$1,433
37,807
kWh
|
$284
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs