Assessment Year | 2024 |
---|---|
Principal Product | Portable Power Generation |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $100 M to 500M |
# of Employees | 499 |
Plant Area |
441,650
ft2
|
Annual Production | 33,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $700,279 | 13,263,227 |
kWh
|
$0.053 |
Electricity Demand | $146,958 | 32,157 |
kW-mo/yr
|
$4.57 |
Electricity Fees | $1,734 | - |
|
- |
Natural Gas | $364,772 | 33,700 |
MMBtu
|
$10.82 |
Fuel Oil #2 | $129,240 | 5,040 |
MMBtu
|
$25.64 |
TOTAL YEARLY COSTS | $1,342,983 | |||
RECOMMENDED SAVINGS* | $85,450 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,444 | $8,455 |
$2,444
46,113
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $860 | $1,251 |
$769
14,506
kWh
|
$91
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,571 | $25,000 |
$7,666
144,637
kWh
|
$905
-
kW-mo/yr
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $9,831 | $10,000 |
$(-1,401.2)
(-26,438)
kWh
|
$(-204.6)
-
kW-mo/yr
|
$11,437
-
MMBtu
|
- | |
05 | 2.7442: Keep doors and windows shut when not on use | $26,412 | $80,000 | - | - |
$26,412
-
MMBtu
|
- | |
06 | 2.9114: Use solar heat to make electricty | $7,831 | $93,870 |
$7,831
147,764
kWh
|
- | - | - | |
07 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $91 | $600 |
$91
1,713
kWh
|
- | - | - | |
08 | 2.3192: Use fossil fuel powered generator during peak demand periods | $29,410 | $782,250 |
$8,610
162,452
kWh
|
- | - | $20,800 | |
TOTAL RECOMMENDED | $85,450 | $1,001,426 |
$26,010
490,747
kWh
|
$792
-
kW-mo/yr
|
$37,849
-
MMBtu
|
$20,800 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs