Assessment Year | 2023 |
---|---|
Principal Product | Low and Medium Voltage Switchgears, lighting panel, Limit Amp |
NAICS | 335313: Switchgear and Switchboard Apparatus Manufacturing |
SIC | 3613: Switchgear and Switchboard Apparatus |
Sales Range | $100 M to 500M |
# of Employees | 405 |
Plant Area |
528,600
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $604,162 | 9,841,717 |
kWh
|
$0.061 |
Electricity Demand | $136,729 | 30,326 |
kW-mo/yr
|
$4.51 |
Electricity Fees | $(-81,340.5) | - |
|
- |
Natural Gas | $410,439 | 37,845 |
MMBtu
|
$10.85 |
TOTAL YEARLY COSTS | $1,069,990 | |||
RECOMMENDED SAVINGS* | $196,797 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8123: Pay utility bills on time | $4,526 | - | - | - | $4,526 | - | |
02 | 2.2123: Insulate feedwater tank | $905 | $1,622 | - | - | - |
$905
-
MMBtu
|
|
03 | 2.2136: Install / repair insulation on steam lines | $2,402 | $3,033 | - | - | - |
$2,402
-
MMBtu
|
|
04 | 2.8114: Change rate schedules or other changes in utility service | $31,379 | - | - | - | $31,379 | - | |
05 | 2.4224: Upgrade controls on compressors | $54,767 | $200,000 |
$53,241
872,799
kWh
|
$1,527
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,812 | $19,750 |
$9,573
156,931
kWh
|
$239
-
kW-mo/yr
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $23,819 | $15,000 |
$(-363.7)
(-5,963)
kWh
|
$(-38.6)
-
kW-mo/yr
|
- |
$24,221
-
MMBtu
|
|
08 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $52,167 | $200,000 | - | - | - |
$52,167
-
MMBtu
|
|
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,381 | - |
$6,702
109,876
kWh
|
$679
-
kW-mo/yr
|
- | - | |
10 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $5,194 | - |
$595
9,750
kWh
|
$4,599
-
kW-mo/yr
|
- | - | |
11 | 2.2113: Repair or replace steam traps | $4,104 | $6,050 | - | - | - |
$4,104
-
MMBtu
|
|
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $340 | $418 |
$285
4,680
kWh
|
$54
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $196,797 | $445,873 |
$70,032
1,148,073
kWh
|
$7,059
-
kW-mo/yr
|
$35,905 |
$83,800
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs