ITAC Assessment: CC0020
ITAC logo
ITAC Assessment: CC0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Low and Medium Voltage Switchgears, lighting panel, Limit Amp
NAICS 335313: Switchgear and Switchboard Apparatus Manufacturing
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $100
M
to 500
M
# of Employees 405
Plant Area 528,600
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $604,162 9,841,717
kWh
Electricity Demand $136,729 30,326
kW-mo/yr
Electricity Fees $(-81,340.5) -
Natural Gas $410,439 37,845
MMBtu
TOTAL YEARLY COSTS $1,069,990
RECOMMENDED SAVINGS* $196,797 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.8123: Pay utility bills on time $4,526 - - - $4,526 -
02 2.2123: Insulate feedwater tank $905 $1,622 - - - $905
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $2,402 $3,033 - - - $2,402
-
MMBtu
04 2.8114: Change rate schedules or other changes in utility service $31,379 - - - $31,379 -
05 2.4224: Upgrade controls on compressors $54,767 $200,000 $53,241
872,799
kWh
$1,527
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,812 $19,750 $9,573
156,931
kWh
$239
-
kW-mo/yr
- -
07 2.2437: Recover waste heat from equipment $23,819 $15,000 $(-363.7)
(-5,963)
kWh
$(-38.6)
-
kW-mo/yr
- $24,221
-
MMBtu
08 2.2426: Use waste heat from flue gases to heat space conditioning air $52,167 $200,000 - - - $52,167
-
MMBtu
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,381 - $6,702
109,876
kWh
$679
-
kW-mo/yr
- -
10 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $5,194 - $595
9,750
kWh
$4,599
-
kW-mo/yr
- -
11 2.2113: Repair or replace steam traps $4,104 $6,050 - - - $4,104
-
MMBtu
12 2.7142: Utilize higher efficiency lamps and/or ballasts $340 $418 $285
4,680
kWh
$54
-
kW-mo/yr
- -
TOTAL RECOMMENDED $196,797 $445,873 $70,032
1,148,073
kWh
$7,059
-
kW-mo/yr
$35,905 $83,800
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs