ITAC Assessment: CC0011
ITAC logo
ITAC Assessment: CC0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Active Pharmaceutical Ingredients
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 110
Plant Area 56,800
ft2
Annual Production 30,000
lb
Production Hrs. Annual 8,520
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $308,821 6,047,392
kWh
Electricity Demand $135,920 12,243
kW-mo/yr
Electricity Fees $1,241 -
Natural Gas $102,772 9,000
MMBtu
TOTAL YEARLY COSTS $548,754
RECOMMENDED SAVINGS* $20,182 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $754 - $581
11,397
kWh
$173
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,227 $680 $894
17,520
kWh
$333
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $5,203 $5,000 $4,409
87,997
kWh
$794
-
kW-mo/yr
-
04 2.4226: Use / purchase optimum sized compressor $2,746 $1,700 $2,107
42,048
kWh
$639
-
kW-mo/yr
-
05 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $10,252 $50,000 $2,361
46,291
kWh
- $7,891
-
MMBtu
TOTAL RECOMMENDED $20,182 $57,380 $10,352
205,253
kWh
$1,939
-
kW-mo/yr
$7,891
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs