ITAC Assessment: CC0003
ITAC logo
ITAC Assessment: CC0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Motor Vehicle Seating
NAICS 336360: Motor Vehicle Seating and Interior Trim Manufacturing
SIC 2396: Automotive Trimmings, Apparel Findings, and Related Products
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 248,187
ft2
Annual Production 37,000
units
Production Hrs. Annual 4,680
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,379 1,029,120
kWh
Electricity Demand $1,560 3,007
kW-mo/yr
Electricity Fees $(-2,804.0) -
Natural Gas $22,631 1,886
MMBtu
TOTAL YEARLY COSTS $139,766
RECOMMENDED SAVINGS* $32,255 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,652 $12,041 $28,085
244,215
kWh
$187
-
kW-mo/yr
$(-4,620.0)
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $1,633 - $1,831
15,922
kWh
$18
-
kW-mo/yr
$(-216.0)
-
MMBtu
03 2.6218: Turn off equipment when not in use $990 - $990
8,611
kWh
- -
04 2.7261: Install timers and/or thermostats $5,980 - $5,980
52,000
kWh
- -
TOTAL RECOMMENDED $32,255 $12,041 $36,886
320,748
kWh
$205
-
kW-mo/yr
$(-4,836.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs