ITAC Assessment: BS0121
ITAC logo
ITAC Assessment: BS0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Ornimental Brass Hardware
NAICS 332323: Ornamental and Architectural Metal Work Manufacturing
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 61,000
ft2
Annual Production 3,100
ton
Production Hrs. Annual 2,480
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,439 1,579,598
kWh
Electricity Demand $59,326 10,931
kW-mo/yr
Electricity Fees $1,201 -
Natural Gas $17,494 3,134
MMBtu
TOTAL YEARLY COSTS $168,460
RECOMMENDED SAVINGS* $8,488 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $109 $125 $79
1,380
kWh
$30
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $178 $218 $122
2,124
kWh
$56
-
kW-mo/yr
-
03 2.7243: Improve air circulation with destratification fans / other methods $904 $880 $(-5.0)
(-84)
kWh
- $909
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,514 $1,010 $1,021
17,830
kWh
$493
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $3,663 $512 $1,448
25,296
kWh
$2,215
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $354 $796 $354
6,191
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,509 $810 $1,509
26,350
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $257 $56 $172
3,008
kWh
$85
-
kW-mo/yr
-
TOTAL RECOMMENDED $8,488 $4,407 $4,700
82,096
kWh
$2,879
-
kW-mo/yr
$909
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs