ITAC Assessment: BS0107
ITAC logo
ITAC Assessment: BS0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Plywood
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 117,500
ft2
Annual Production 280,000
units
Production Hrs. Annual 8,128
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,826,665 34,844,804
kWh
Electricity Demand $390,061 59,514
kW-mo/yr
Natural Gas $796,677 184,154
MMBtu
TOTAL YEARLY COSTS $3,013,404
RECOMMENDED SAVINGS* $96,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $4,338 $5,117 - - $4,338
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $2,846 $2,224 $2,433
46,428
kWh
$413
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $23,395 $2,640 $19,975
381,200
kWh
$3,420
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $54,676 $1,500 $46,683
890,892
kWh
$7,994
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11,021 $32,160 $9,410
179,580
kWh
$1,611
-
kW-mo/yr
-
TOTAL RECOMMENDED $96,277 $43,641 $78,500
1,498,100
kWh
$13,438
-
kW-mo/yr
$4,338
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs