ITAC Assessment: BS0102
ITAC logo
ITAC Assessment: BS0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Trailers
NAICS 336212: Truck Trailer Manufacturing
SIC 3715: Truck Trailers
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 94,000
ft2
Annual Production 1,200
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,800 501,327
kWh
Electricity Demand $6,981 1,050
kW-mo/yr
Electricity Fees $1,856 -
Natural Gas $33,799 5,201
MMBtu
Waste Disposal Costs
Water Usage $1,148 335
Tgal
Other Liquid (haz) $6,177 2,656
gal
TOTAL YEARLY COSTS $87,761
RECOMMENDED SAVINGS* $17,416 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $7,306 $495 $7,306
95,586
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,159 $10,362 $2,756
36,546
kWh
$1,403
-
kW-mo/yr
- -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $1,991 $1,301 - - $1,991
-
MMBtu
-
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $194 $682 $194
2,571
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,365 $734 $1,655
21,831
kWh
$710
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $436 $672 $436
5,776
kWh
- - -
07 2.7135: Install occupancy sensors $91 $85 $91
1,211
kWh
- - -
08 2.8123: Pay utility bills on time $874 $144 - - - $874
TOTAL RECOMMENDED $17,416 $14,475 $12,438
163,521
kWh
$2,113
-
kW-mo/yr
$1,991
-
MMBtu
$874
TOTAL IMPLEMENTED $15,140 $12,407 $12,153
159,739
kWh
$2,113
-
kW-mo/yr
- $874
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs