ITAC Assessment: BS0099
ITAC logo
ITAC Assessment: BS0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 86
Plant Area 30,000
ft2
Annual Production 310
Tgal
Production Hrs. Annual 3,380
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,116 663,161
kWh
Electricity Demand $11,799 2,542
kW-mo/yr
Electricity Fees $607 -
Natural Gas $38,494 5,667
MMBtu
Waste Disposal Costs
Water Usage $8,034 2,433
Tgal
Water Disposal $10,205 1,477
Tgal
Gaseous Waste $13,657 55,650
lb
TOTAL YEARLY COSTS $121,912
RECOMMENDED SAVINGS* $94,181 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Gaseous Waste Savings Increase in Production Savings
01 3.5311: Recover and reuse waste material $83,061 $200,000 $(-104.0)
(-1,755)
kWh
$(-835.0)
-
kW-mo/yr
- - - - $84,000
02 4.212: Adopt in-house material generation $7,623 $60,000 - - - - - $7,623
-
lb
-
03 2.2414: Use waste heat from hot flue gases to preheat $866 $2,440 - - $866
-
MMBtu
- - - -
04 2.1113: Reduce combustion air flow to optimum $789 $144 - - $789
-
MMBtu
- - - -
05 3.4113: Treat and reuse rinse waters $773 $7,514 - - - $201
-
Tgal
$572
-
Tgal
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $456 $7 $456
7,734
kWh
- - - - - -
07 2.7111: Reduce illumination to minimum necessary levels $428 $308 $294
4,992
kWh
$134
-
kW-mo/yr
- - - - -
08 2.7224: Reduce space conditioning during non-working hours $135 $13 - - $135
-
MMBtu
- - - -
09 2.4221: Install compressor air intakes in coolest locations $50 $260 $50
839
kWh
- - - - - -
TOTAL RECOMMENDED $94,181 $270,686 $696
11,810
kWh
$(-701.0)
-
kW-mo/yr
$1,790
-
MMBtu
$201
-
Tgal
$572
-
Tgal
$7,623
-
lb
$84,000
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Gaseous Waste Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs