ITAC Assessment: BS0095
ITAC logo
ITAC Assessment: BS0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Trailers
NAICS 336212: Truck Trailer Manufacturing
SIC 3715: Truck Trailers
Sales Range $100
M
to 500
M
# of Employees 305
Plant Area 200,000
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 4,020
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,298 2,739,363
kWh
Electricity Demand $66,159 10,208
kW-mo/yr
Electricity Fees $18,655 -
Natural Gas $52,857 7,699
MMBtu
TOTAL YEARLY COSTS $270,969
RECOMMENDED SAVINGS* $55,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,961

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $9,634 $1,202 $9,634
197,977
kWh
- - -
02 2.4322: Use or replace with energy efficient substitutes $4,164 $45,960 $2,784
57,199
kWh
$1,380
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,935 $15,234 $4,555
93,599
kWh
$1,380
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $9,156 $20,491 - - $9,156 -
05 2.4221: Install compressor air intakes in coolest locations $5,362 $1,171 $3,880
79,666
kWh
$1,482
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,327 $128 $1,290
26,489
kWh
$37
-
kW-mo/yr
- -
07 2.4224: Upgrade controls on compressors $9,891 $13,498 $6,858
147,166
kWh
$3,033
-
kW-mo/yr
- -
08 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $10,520 $21,040 - - - $10,520
-
MMBtu
TOTAL RECOMMENDED $55,989 $118,724 $29,001
602,096
kWh
$7,312
-
kW-mo/yr
$9,156 $10,520
-
MMBtu
TOTAL IMPLEMENTED $10,961 $1,330 $10,924
224,466
kWh
$37
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs