ITAC Assessment: BS0067
ITAC logo
ITAC Assessment: BS0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Timber Homes
NAICS 321992: Prefabricated Wood Building Manufacturing
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 35,600
ft2
Annual Production 60
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,242 362,400
kWh
Electricity Demand $16,857 2,910
kW-mo/yr
Electricity Fees $202 -
Natural Gas $10,747 1,479
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,712

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $799 $5,986 $799
14,300
kWh
- -
02 2.7224: Reduce space conditioning during non-working hours $762 $77 - - $762
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $473 $528 $473
8,470
kWh
- -
04 2.4224: Upgrade controls on compressors $1,007 $1,161 $472
8,449
kWh
$535
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $470 $535 $470
8,415
kWh
- -
TOTAL RECOMMENDED $3,511 $8,287 $2,214
39,634
kWh
$535
-
kW-mo/yr
$762
-
MMBtu
TOTAL IMPLEMENTED $2,712 $2,301 $1,415
25,334
kWh
$535
-
kW-mo/yr
$762
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs