ITAC Assessment: BS0065
ITAC logo
ITAC Assessment: BS0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Steel Foundries (except investment)
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 200,000
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 6,792
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $511,354 7,140,460
kWh
Electricity Demand $208,126 26,238
kW-mo/yr
Natural Gas $124,150 14,960
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,465

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,229 $46,340 $15,259
211,931
kWh
$2,970
-
kW-mo/yr
-
02 2.2414: Use waste heat from hot flue gases to preheat $4,215 $10,715 - - $4,215
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $5,088 $160 $4,255
59,091
kWh
$833
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $148 $15 $142
1,976
kWh
$6
-
kW-mo/yr
-
TOTAL RECOMMENDED $27,680 $57,230 $19,656
272,998
kWh
$3,809
-
kW-mo/yr
$4,215
-
MMBtu
TOTAL IMPLEMENTED $23,465 $46,515 $19,656
272,998
kWh
$3,809
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs