Assessment Year | 2015 |
---|---|
Principal Product | Steel Foundries (except investment) |
NAICS | 331513: Steel Foundries (except Investment) |
SIC | 3325: Steel Foundries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
200,000
ft2
|
Annual Production | 80,000
pieces
|
Production Hrs. Annual | 6,792
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $511,354 | 7,140,460 |
kWh
|
$0.072 |
Electricity Demand | $208,126 | 26,238 |
kW-mo/yr
|
$7.93 |
Natural Gas | $124,150 | 14,960 |
MMBtu
|
$8.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,465 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,229 | $46,340 |
$15,259
211,931
kWh
|
$2,970
-
kW-mo/yr
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $4,215 | $10,715 | - | - |
$4,215
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $5,088 | $160 |
$4,255
59,091
kWh
|
$833
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $148 | $15 |
$142
1,976
kWh
|
$6
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $27,680 | $57,230 |
$19,656
272,998
kWh
|
$3,809
-
kW-mo/yr
|
$4,215
-
MMBtu
|
||
TOTAL IMPLEMENTED | $23,465 | $46,515 |
$19,656
272,998
kWh
|
$3,809
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs