| Assessment Year | 2015 |
|---|---|
| Principal Product | Steel Foundries (except investment) |
| NAICS | 331513: Steel Foundries (except Investment) |
| SIC | 3325: Steel Foundries, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
200,000
ft2
|
| Annual Production | 80,000
pieces
|
| Production Hrs. Annual | 6,792
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $511,354 | 7,140,460 |
kWh
|
$0.072 |
| Electricity Demand | $208,126 | 26,238 |
kW-mo/yr
|
$7.93 |
| Natural Gas | $124,150 | 14,960 |
MMBtu
|
$8.30 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,465 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,229 | $46,340 |
$15,259
211,931
kWh
|
$2,970
-
kW-mo/yr
|
- | |
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $4,215 | $10,715 | - | - |
$4,215
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $5,088 | $160 |
$4,255
59,091
kWh
|
$833
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $148 | $15 |
$142
1,976
kWh
|
$6
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $27,680 | $57,230 |
$19,656
272,998
kWh
|
$3,809
-
kW-mo/yr
|
$4,215
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $23,465 | $46,515 |
$19,656
272,998
kWh
|
$3,809
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs