| Assessment Year | 2014 |
|---|---|
| Principal Product | Frozen Seafood |
| NAICS | 311710: Seafood Product Preparation and Packaging |
| SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
| Sales Range | $50 M to 100M |
| # of Employees | 325 |
| Plant Area |
80,000
ft2
|
| Annual Production | 200,000,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Alaska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $982,181 | 7,223,440 |
kWh
|
$0.14 |
| Electricity Demand | $118,051 | 19,199 |
kW-mo/yr
|
$6.15 |
| Electricity Fees | $2,471 | - |
|
- |
| Fuel Oil #2 | $324,138 | 11,576 |
MMBtu
|
$28.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $245,457 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $193,256 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $63,855 | $15,000 |
$63,855
469,524
kWh
|
- | - | |
| 02 | 2.2511: Insulate bare equipment | $8,916 | $19,760 |
$7,146
52,542
kWh
|
$1,770
-
kW-mo/yr
|
- | |
| 03 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $111,915 | $69,000 |
$(-38,759.0)
(-284,990)
kWh
|
$(-9,736.0)
-
kW-mo/yr
|
$160,410
-
MMBtu
|
|
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $13,411 | $5,075 |
$13,411
98,610
kWh
|
- | - | |
| 05 | 2.5121: Redesign flow to minimize mass transfer length | $13,508 | $17,493 |
$12,985
95,481
kWh
|
$523
-
kW-mo/yr
|
- | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,075 | $429 |
$4,075
29,963
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,042 | $52,954 |
$21,695
159,520
kWh
|
$1,347
-
kW-mo/yr
|
- | |
| 08 | 2.7135: Install occupancy sensors | $2,340 | $981 |
$2,340
17,203
kWh
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,381 | $7,554 |
$3,381
24,859
kWh
|
- | - | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,014 | $1,242 |
$988
7,267
kWh
|
$26
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $245,457 | $189,488 |
$91,117
669,979
kWh
|
$(-6,070.0)
-
kW-mo/yr
|
$160,410
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $193,256 | $89,504 |
$42,582
313,107
kWh
|
$(-9,736.0)
-
kW-mo/yr
|
$160,410
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs