| Assessment Year | 2014 |
|---|---|
| Principal Product | Aluminum Castings |
| NAICS | 331524: Aluminum Foundries (except Die-Casting) |
| SIC | 3365: Aluminum Foundries |
| Sales Range | $1 M to 5M |
| # of Employees | 25 |
| Plant Area |
37,000
ft2
|
| Annual Production | 3,000,000
lb
|
| Production Hrs. Annual | 4,824
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $83,623 | 1,327,080 |
kWh
|
$0.063 |
| Electricity Demand | $28,452 | 5,871 |
kW-mo/yr
|
$4.85 |
| Natural Gas | $25,876 | 3,634 |
MMBtu
|
$7.12 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,981 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,316 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $174 | $977 |
$174
2,764
kWh
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $300 | $15 |
$252
3,998
kWh
|
$48
-
kW-mo/yr
|
- | |
| 03 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $3,665 | $2,000 |
$3,665
58,169
kWh
|
- | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $6,239 | $650 |
$6,239
94,044
kWh
|
- | - | |
| 05 | 2.7444: Close holes and openings in building such as broken windows | $361 | $467 | - | - |
$361
-
MMBtu
|
|
| 06 | 2.7135: Install occupancy sensors | $242 | $660 |
$242
3,855
kWh
|
- | - | |
| TOTAL RECOMMENDED | $10,981 | $4,769 |
$10,572
162,830
kWh
|
$48
-
kW-mo/yr
|
$361
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,316 | $2,769 |
$6,907
104,661
kWh
|
$48
-
kW-mo/yr
|
$361
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs