ITAC Assessment: BS0031
ITAC logo
ITAC Assessment: BS0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Aluminum Castings
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 37,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 4,824
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,623 1,327,080
kWh
Electricity Demand $28,452 5,871
kW-mo/yr
Natural Gas $25,876 3,634
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,981 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,316

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $174 $977 $174
2,764
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $300 $15 $252
3,998
kWh
$48
-
kW-mo/yr
-
03 2.1121: Use insulation in furnaces to facilitate heating / cooling $3,665 $2,000 $3,665
58,169
kWh
- -
04 2.4239: Eliminate or reduce compressed air usage $6,239 $650 $6,239
94,044
kWh
- -
05 2.7444: Close holes and openings in building such as broken windows $361 $467 - - $361
-
MMBtu
06 2.7135: Install occupancy sensors $242 $660 $242
3,855
kWh
- -
TOTAL RECOMMENDED $10,981 $4,769 $10,572
162,830
kWh
$48
-
kW-mo/yr
$361
-
MMBtu
TOTAL IMPLEMENTED $7,316 $2,769 $6,907
104,661
kWh
$48
-
kW-mo/yr
$361
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs