ITAC Assessment: UD0124
ITAC logo
ITAC Assessment: UD0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product INDUSTRIAL FANS
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,293 974,795
kWh
Natural Gas $61,669 10,982
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,999 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,999

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $6,949 $30,000 - $6,949
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,158 $1,674 $1,280
22,567
kWh
$(-122.0)
-
MMBtu
03 2.2511: Insulate bare equipment $1,892 $1,000 - $1,892
-
MMBtu
TOTAL RECOMMENDED $9,999 $32,674 $1,280
22,567
kWh
$8,719
-
MMBtu
TOTAL IMPLEMENTED $9,999 $32,674 $1,280
22,567
kWh
$8,719
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs