Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Sheet Metal Products
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 89,000
ft2
Annual Production 4,100
ton
Production Hrs. Annual 4,808
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,317 650,938
kWh
Natural Gas $20,010 4,258
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,122 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $239 $1,130 $239
3,224
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,964 $16,588 $11,964
161,196
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $101 $300 - $101
-
MMBtu
04 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $202 $887 $202
10,844
kWh
-
05 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $616 $2,420 $616
32,825
kWh
-
TOTAL RECOMMENDED $13,122 $21,325 $13,021
208,089
kWh
$101
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs