Assessment Year | 2014 |
---|---|
Principal Product | Dried Milk Product |
NAICS | 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing |
SIC | 2023: Dry, Condensed, and Evaporated Dairy Products |
Sales Range | $5 M to 10M |
# of Employees | 106 |
Plant Area |
110,000
ft2
|
Annual Production | 182,500,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,203,148 | 33,007,811 |
kWh
|
$0.036 |
Electricity Demand | $372,112 | 55,720 |
kW-mo/yr
|
$6.68 |
Electricity Fees | $3,732 | - |
|
- |
Natural Gas | $2,173,353 | 463,112 |
MMBtu
|
$4.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $102,031 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $93,880 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $3,764 | $1,960 |
$2,906
79,717
kWh
|
$858
-
kW-mo/yr
|
- | - | |
02 | 2.4323: Use optimum size and capacity equipment | $10,219 | $7,950 |
$10,219
280,355
kWh
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,895 | $15,396 |
$7,895
216,599
kWh
|
- | - | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,837 | $449 | - | - |
$8,837
-
MMBtu
|
- | |
05 | 2.2113: Repair or replace steam traps | $60,962 | $13,425 | - | - |
$55,275
-
MMBtu
|
$5,687
-
Tgal
|
|
06 | 2.1213: Direct warmest air to combustion intake | $6,297 | $380 | - | - |
$6,297
-
MMBtu
|
- | |
07 | 2.7124: Make a practice of turning off lights when not needed | $1,854 | $4,175 |
$1,854
50,878
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,203 | $15,635 |
$2,203
60,444
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $102,031 | $59,370 |
$25,077
687,993
kWh
|
$858
-
kW-mo/yr
|
$70,409
-
MMBtu
|
$5,687
-
Tgal
|
||
TOTAL IMPLEMENTED | $93,880 | $54,815 |
$23,223
637,115
kWh
|
$858
-
kW-mo/yr
|
$64,112
-
MMBtu
|
$5,687
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs