ITAC Assessment: BS0028
ITAC logo
ITAC Assessment: BS0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Dried Milk Product
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $5
M
to 10
M
# of Employees 106
Plant Area 110,000
ft2
Annual Production 182,500,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,203,148 33,007,811
kWh
Electricity Demand $372,112 55,720
kW-mo/yr
Electricity Fees $3,732 -
Natural Gas $2,173,353 463,112
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,031 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.4221: Install compressor air intakes in coolest locations $3,764 $1,960 $2,906
79,717
kWh
$858
-
kW-mo/yr
- -
02 2.4323: Use optimum size and capacity equipment $10,219 $7,950 $10,219
280,355
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,895 $15,396 $7,895
216,599
kWh
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $8,837 $449 - - $8,837
-
MMBtu
-
05 2.2113: Repair or replace steam traps $60,962 $13,425 - - $55,275
-
MMBtu
$5,687
-
Tgal
06 2.1213: Direct warmest air to combustion intake $6,297 $380 - - $6,297
-
MMBtu
-
07 2.7124: Make a practice of turning off lights when not needed $1,854 $4,175 $1,854
50,878
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,203 $15,635 $2,203
60,444
kWh
- - -
TOTAL RECOMMENDED $102,031 $59,370 $25,077
687,993
kWh
$858
-
kW-mo/yr
$70,409
-
MMBtu
$5,687
-
Tgal
TOTAL IMPLEMENTED $93,880 $54,815 $23,223
637,115
kWh
$858
-
kW-mo/yr
$64,112
-
MMBtu
$5,687
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs