Assessment Year | 2013 |
---|---|
Principal Product | Milk, Sour Cream, Cottage Cheese |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 130 |
Plant Area |
100,000
ft2
|
Annual Production | 39,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $377,051 | 12,815,595 |
kWh
|
$0.029 |
Electricity Demand | $108,161 | 25,023 |
kW-mo/yr
|
$4.32 |
Electricity Fees | $77,479 | - |
|
- |
Natural Gas | $967,680 | 131,248 |
MMBtu
|
$7.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $772,484 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,127 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,591 | $260 |
$1,591
51,415
kWh
|
- | - | - | |
02 | 2.6218: Turn off equipment when not in use | $1,495 | $1,840 |
$1,495
48,320
kWh
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $1,533 | $2,806 |
$(-59.4)
(-1,921)
kWh
|
- |
$1,592
-
MMBtu
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $2,077 | $689 |
$1,647
53,220
kWh
|
$430
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,037 | $126 |
$2,037
65,843
kWh
|
- | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $5,422 | $3,959 | - | - |
$5,422
-
MMBtu
|
- | |
07 | 2.2136: Install / repair insulation on steam lines | $3,187 | $1,066 | - | - |
$3,187
-
MMBtu
|
- | |
08 | 2.7233: Use properly designed and sized hvac equipment | $11,756 | $210 |
$11,756
379,946
kWh
|
- | - | - | |
09 | 2.1336: Install equipment to utilize waste fuel | $743,387 | $1,700,000 | - | - | - | $743,387 | |
TOTAL RECOMMENDED | $772,484 | $1,710,956 |
$18,467
596,823
kWh
|
$430
-
kW-mo/yr
|
$10,201
-
MMBtu
|
$743,387 | ||
TOTAL IMPLEMENTED | $11,127 | $5,034 |
$5,275
170,478
kWh
|
$430
-
kW-mo/yr
|
$5,422
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs