Assessment Year | 2016 |
---|---|
Principal Product | Electrical cables and connectors |
NAICS | 334417: Electronic Connector Manufacturing |
SIC | 3678: Electronic Connectors |
Sales Range | $10 M to 50M |
# of Employees | 63 |
Plant Area |
40,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 4,732
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,303 | 1,137,016 |
kWh
|
$0.050 |
Electricity Demand | $20,257 | 3,187 |
kW-mo/yr
|
$6.36 |
Electricity Fees | $909 | - |
|
- |
Natural Gas | $5,520 | 744 |
MMBtu
|
$7.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,127 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,189 | $19,140 |
$4,622
91,702
kWh
|
$1,479
-
kW-mo/yr
|
- | $88 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $854 | $100 |
$647
12,833
kWh
|
$207
-
kW-mo/yr
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $841 | $1,500 | - | - |
$841
-
MMBtu
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $780 | $20 |
$591
11,726
kWh
|
$189
-
kW-mo/yr
|
- | - | |
05 | 2.7135: Install occupancy sensors | $253 | $150 |
$185
3,666
kWh
|
$68
-
kW-mo/yr
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $210 | $500 |
$159
3,148
kWh
|
$51
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $9,127 | $21,410 |
$6,204
123,075
kWh
|
$1,994
-
kW-mo/yr
|
$841
-
MMBtu
|
$88 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs