Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Electrical cables and connectors
NAICS 334417: Electronic Connector Manufacturing
SIC 3678: Electronic Connectors
Sales Range $10
M
to 50
M
# of Employees 63
Plant Area 40,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,732
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,303 1,137,016
kWh
Electricity Demand $20,257 3,187
kW-mo/yr
Electricity Fees $909 -
Natural Gas $5,520 744
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,189 $19,140 $4,622
91,702
kWh
$1,479
-
kW-mo/yr
- $88
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $854 $100 $647
12,833
kWh
$207
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $841 $1,500 - - $841
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $780 $20 $591
11,726
kWh
$189
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $253 $150 $185
3,666
kWh
$68
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $210 $500 $159
3,148
kWh
$51
-
kW-mo/yr
- -
TOTAL RECOMMENDED $9,127 $21,410 $6,204
123,075
kWh
$1,994
-
kW-mo/yr
$841
-
MMBtu
$88
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs