ITAC Assessment: BD0477
ITAC logo
ITAC Assessment: BD0477
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Can Liners, Drawstring Bags
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $50
M
to 100
M
# of Employees 40
Plant Area 233,403
ft2
Annual Production 52,389,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,445 1,577,177
kWh
Electricity Demand $26,630 4,306
kW-mo/yr
Electricity Fees $3,377 -
Natural Gas $31,159 5,882
MMBtu
LPG $15,462 753
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,312 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,854 $42,330 $12,988
216,836
kWh
$3,866
-
kW-mo/yr
- - - -
02 2.8227: Adjust / maintain fork lift trucks for most efficient operation $12,472 $8,000 $(-2,990.0)
(-49,920)
kWh
- - $15,462
-
MMBtu
- -
03 2.7231: Use radiant heater for spot heating $8,451 $20,000 $247
4,117
kWh
$99
-
kW-mo/yr
$8,105
-
MMBtu
- - -
04 2.4221: Install compressor air intakes in coolest locations $3,131 $500 $2,413
40,285
kWh
$718
-
kW-mo/yr
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,507 $20 $1,981
34,155
kWh
$526
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,182 $1,000 $758
12,649
kWh
$107
-
kW-mo/yr
- - $146 $171
07 2.7142: Utilize higher efficiency lamps and/or ballasts $971 $800 $748
12,497
kWh
$223
-
kW-mo/yr
- - - -
08 2.4133: Use most efficient type of electric motors $744 $2,450 $542
9,051
kWh
$202
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $46,312 $75,100 $16,687
279,670
kWh
$5,741
-
kW-mo/yr
$8,105
-
MMBtu
$15,462
-
MMBtu
$146 $171
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs