ITAC Assessment: BD0465
ITAC logo
ITAC Assessment: BD0465
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Precision-welded metal products (esp. various parts for aircraft)
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 53,500
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,980 819,645
kWh
Electricity Demand $34,868 5,759
kW-mo/yr
Electricity Fees $615 -
Natural Gas $12,145 2,250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $86,701

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $12,916 $28,000 - - $2,516
-
MMBtu
$10,400 - -
02 2.3113: Make ice during off peak hours for cooling $11,490 $62,000 - $11,490
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $972 $3,705 $654
8,789
kWh
$307
-
kW-mo/yr
- $3 - $8
04 2.7135: Install occupancy sensors $906 $1,200 $413
5,556
kWh
$493
-
kW-mo/yr
- - - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $837 $648 - - $837
-
MMBtu
- - -
06 2.2437: Recover waste heat from equipment $330 $800 - - $330
-
MMBtu
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $256 $305 $65
869
kWh
$30
-
kW-mo/yr
- $65 - $96
08 4.521: Clear and rent existing space $71,910 $2,000 - - - - $71,910 -
09 4.212: Adopt in-house material generation $7,962 $22,000 - - - - - $7,962
TOTAL RECOMMENDED $107,579 $120,658 $1,132
15,214
kWh
$12,320
-
kW-mo/yr
$3,683
-
MMBtu
$10,468 $71,910 $8,066
TOTAL IMPLEMENTED $86,701 $70,658 $1,132
15,214
kWh
$12,320
-
kW-mo/yr
$1,167
-
MMBtu
$68 $71,910 $104
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs