| Assessment Year | 2015 |
|---|---|
| Principal Product | Baked goods |
| NAICS | 311919: Other Snack Food Manufacturing |
| SIC | 2052: Cookies and Crackers |
| Sales Range | $50 M to 100M |
| # of Employees | 375 |
| Plant Area |
290,000
ft2
|
| Annual Production | 50,000,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $324,664 | 5,103,289 |
kWh
|
$0.064 |
| Electricity Demand | $71,841 | 11,850 |
kW-mo/yr
|
$6.06 |
| Electricity Fees | $10,199 | - |
|
- |
| Natural Gas | $229,709 | 33,505 |
MMBtu
|
$6.86 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,708 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,698 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2442: Preheat combustion air with waste heat | $12,126 | $18,000 |
$(-7,481.0)
(-117,629)
kWh
|
$(-976.0)
-
kW-mo/yr
|
$20,583
-
MMBtu
|
- | - | |
| 02 | 2.4226: Use / purchase optimum sized compressor | $11,746 | $20,000 |
$10,390
163,374
kWh
|
$1,356
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.1221: Replace obsolete burners with more efficient ones | $9,022 | $30,000 | - | - |
$9,022
-
MMBtu
|
- | - | |
| 04 | 2.7135: Install occupancy sensors | $6,685 | $3,075 |
$5,659
88,976
kWh
|
$1,026
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,866 | $20 | - |
$3,866
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $2,364 | $2,900 |
$2,081
32,723
kWh
|
$283
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $1,313 | $750 |
$1,161
18,258
kWh
|
$152
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $996 | $700 |
$550
8,655
kWh
|
$72
-
kW-mo/yr
|
- | $153 | $221 | |
| 09 | 2.6214: Shut off pilots in standby equipment | $590 | $40 | - | - |
$590
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $48,708 | $75,485 |
$12,360
194,357
kWh
|
$5,779
-
kW-mo/yr
|
$30,195
-
MMBtu
|
$153 | $221 | ||
| TOTAL IMPLEMENTED | $22,698 | $26,765 |
$19,291
303,331
kWh
|
$2,817
-
kW-mo/yr
|
$590
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs