*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Switchgears, Controls, Power Generation Equipment
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 160,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,765 1,027,212
kWh
Electricity Fees $943 -
Natural Gas $60,758 8,953
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,192

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.7231: Use radiant heater for spot heating $9,937 $8,800 - $9,937
-
MMBtu
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,640 $300 $8,640
129,166
kWh
- - - - - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $8,604 $3,500 - $8,604
-
MMBtu
- - - - -
04 2.1221: Replace obsolete burners with more efficient ones $6,049 $4,000 - $6,049
-
MMBtu
- - - - -
05 2.1224: Replace boiler $3,962 $7,604 - $3,962
-
MMBtu
- - - - -
06 2.4226: Use / purchase optimum sized compressor $2,511 $1,400 $2,511
37,532
kWh
- - - - - -
07 2.7135: Install occupancy sensors $861 $975 $861
12,870
kWh
- - - - - -
08 2.1222: Install turbulators $595 $1,160 - $595
-
MMBtu
- - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $396 $325 $245
3,662
kWh
- - - $63 $88 -
10 2.4221: Install compressor air intakes in coolest locations $29 $54 $29
435
kWh
- - - - - -
11 3.2123: Convert to high volume low pressure (hvlp) paint guns $15,189 $2,000 - - $15,189
-
gal
- - - -
12 3.5315: Lease / purchase baler; sell cardboard to recycler $7,464 $6,000 - - - $5,160
-
lb
- - $2,304
13 3.5316: Contract a wood pallet recycling company $6,060 $300 - - - $6,060
-
lb
- - -
TOTAL RECOMMENDED $70,297 $36,418 $12,286
183,665
kWh
$29,147
-
MMBtu
$15,189
-
gal
$11,220
-
lb
$63 $88 $2,304
TOTAL IMPLEMENTED $37,192 $24,204 $8,640
129,166
kWh
$28,552
-
MMBtu
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs