Assessment Year | 2014 |
---|---|
Principal Product | Plastic injection molded parts |
NAICS | 326121: Unlaminated Plastics Profile Shape Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 37 |
Plant Area |
27,000
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,869 | 1,805,800 |
kWh
|
$0.076 |
Electricity Demand | $13,476 | 4,868 |
kW-mo/yr
|
$2.77 |
Electricity Fees | $2,132 | - |
|
- |
Natural Gas | $9,068 | 1,287 |
MMBtu
|
$7.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,716 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,430 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,825 | $4,565 |
$2,641
34,828
kWh
|
$184
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7135: Install occupancy sensors | $2,841 | $750 |
$2,583
34,082
kWh
|
$258
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,830 | $600 |
$2,708
32,087
kWh
|
$122
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,291 | $20 |
$2,182
28,780
kWh
|
$109
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,686 | $1,310 |
$1,575
20,774
kWh
|
$111
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7231: Use radiant heater for spot heating | $909 | $3,300 | - | - |
$909
-
MMBtu
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $823 | $300 |
$784
10,340
kWh
|
$39
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $600 | $435 |
$378
4,993
kWh
|
$19
-
kW-mo/yr
|
- | $86 | - | $117 | |
09 | 3.5316: Contract a wood pallet recycling company | $2,911 | $80 | - | - | - | - | $2,911 | - | |
TOTAL RECOMMENDED | $17,716 | $11,360 |
$12,851
165,884
kWh
|
$842
-
kW-mo/yr
|
$909
-
MMBtu
|
$86 | $2,911 | $117 | ||
TOTAL IMPLEMENTED | $3,430 | $1,035 |
$3,086
37,080
kWh
|
$141
-
kW-mo/yr
|
- | $86 | - | $117 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs