Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Rivets, specialty fasteners
NAICS 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 40,000
ft2
Annual Production 2,100,000,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,992 1,680,516
kWh
Electricity Demand $23,156 4,601
kW-mo/yr
Electricity Fees $883 -
Natural Gas $11,937 2,032
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,606 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $27,211 $32,460 $24,868
354,251
kWh
$2,343
-
kW-mo/yr
- - -
02 2.4224: Upgrade controls on compressors $11,901 $20 $10,212
145,470
kWh
$1,689
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,412 $1,450 $4,819
68,644
kWh
$1,593
-
kW-mo/yr
- - -
04 2.7231: Use radiant heater for spot heating $3,480 $3,300 - - $3,480
-
MMBtu
- -
05 2.7122: Disconnect ballasts $2,662 $880 $2,258
32,170
kWh
$404
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $2,203 $1,000 $1,890
26,928
kWh
$313
-
kW-mo/yr
- - -
07 2.2437: Recover waste heat from equipment $2,063 $1,000 - - $2,063
-
MMBtu
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,622 $20 $1,435
20,438
kWh
$187
-
kW-mo/yr
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $898 $600 $771
10,980
kWh
$127
-
kW-mo/yr
- - -
10 2.7135: Install occupancy sensors $734 $900 $453
6,455
kWh
$281
-
kW-mo/yr
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $420 $310 $243
3,329
kWh
$28
-
kW-mo/yr
- $69 $80
TOTAL RECOMMENDED $59,606 $41,940 $46,949
668,665
kWh
$6,965
-
kW-mo/yr
$5,543
-
MMBtu
$69 $80
TOTAL IMPLEMENTED - - - - - - -