ITAC Assessment: BD0414
ITAC logo
ITAC Assessment: BD0414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Plastic Trash Bags
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 66,900
ft2
Annual Production 55,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $789,931 11,056,039
kWh
Electricity Demand $117,225 20,987
kW-mo/yr
Electricity Fees $12,531 -
Natural Gas $3,025 265
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,305 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,204

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $68,497 $102,400 $61,862
866,409
kWh
$6,635
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $10,674 $20 $9,640
135,020
kWh
$1,034
-
kW-mo/yr
- -
03 2.7111: Reduce illumination to minimum necessary levels $8,975 $1,200 $8,106
113,530
kWh
$869
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $7,526 $1,500 $6,804
95,289
kWh
$722
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,204 $4,750 $4,665
65,336
kWh
$539
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $1,989 $1,530 $1,696
23,750
kWh
$293
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $440 $197 $214
2,995
kWh
$23
-
kW-mo/yr
$94 $109
TOTAL RECOMMENDED $103,305 $111,597 $92,987
1,302,329
kWh
$10,115
-
kW-mo/yr
$94 $109
TOTAL IMPLEMENTED $5,204 $4,750 $4,665
65,336
kWh
$539
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs