ITAC Assessment: SD0606
ITAC logo
ITAC Assessment: SD0606
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Lighting Products
NAICS 335121: Residential Electric Lighting Fixture Manufacturing
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $50
M
to 100
M
# of Employees 270
Plant Area 430,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 7,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,683 2,727,985
kWh
Electricity Demand $161,398 6,284
kW-mo/yr
Electricity Fees $6,732 -
TOTAL YEARLY COSTS $419,813
RECOMMENDED SAVINGS* $57,609 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,914

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $52,049 $46,262 $34,581
374,635
kWh
$16,035
-
kW-mo/yr
$1,433
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,424 $3,341 $1,967
21,312
kWh
$457
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,375 $300 $1,116
12,096
kWh
$258
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,222 $4,345 $773
8,379
kWh
$449
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $539 - $539
5,838
kWh
- -
TOTAL RECOMMENDED $57,609 $54,248 $38,976
422,260
kWh
$17,199
-
kW-mo/yr
$1,433
TOTAL IMPLEMENTED $1,914 $300 $1,655
17,934
kWh
$258
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs