Assessment Year | 2012 |
---|---|
Principal Product | Canned and bottled beverages |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 108 |
Plant Area |
201,000
ft2
|
Annual Production | 360,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $340,936 | 6,536,197 |
kWh
|
$0.052 |
Electricity Demand | $61,333 | 16,713 |
kW-mo/yr
|
$3.67 |
Electricity Fees | $2,487 | - |
|
- |
Natural Gas | $206,881 | 36,558 |
MMBtu
|
$5.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $124,893 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,901 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1221: Replace obsolete burners with more efficient ones | $49,969 | $32,000 | - | - |
$49,969
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,392 | $76,240 |
$28,404
549,485
kWh
|
$2,988
-
kW-mo/yr
|
- | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $28,023 | $25,000 | - | - |
$28,023
-
MMBtu
|
|
04 | 2.7135: Install occupancy sensors | $4,130 | $8,000 |
$4,130
79,886
kWh
|
- | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,137 | $20 |
$6,137
118,704
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $3,573 | $1,500 |
$3,125
60,446
kWh
|
$448
-
kW-mo/yr
|
- | |
07 | 2.2135: Repair and eliminate steam leaks | $1,669 | $100 | - | - |
$1,669
-
MMBtu
|
|
TOTAL RECOMMENDED | $124,893 | $142,860 |
$41,796
808,521
kWh
|
$3,436
-
kW-mo/yr
|
$79,661
-
MMBtu
|
||
TOTAL IMPLEMENTED | $46,901 | $85,860 |
$41,796
808,521
kWh
|
$3,436
-
kW-mo/yr
|
$1,669
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs