ITAC Assessment: BD0404
ITAC logo
ITAC Assessment: BD0404
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Canned and bottled beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 201,000
ft2
Annual Production 360,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $340,936 6,536,197
kWh
Electricity Demand $61,333 16,713
kW-mo/yr
Electricity Fees $2,487 -
Natural Gas $206,881 36,558
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $124,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,901

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1221: Replace obsolete burners with more efficient ones $49,969 $32,000 - - $49,969
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $31,392 $76,240 $28,404
549,485
kWh
$2,988
-
kW-mo/yr
-
03 2.2414: Use waste heat from hot flue gases to preheat $28,023 $25,000 - - $28,023
-
MMBtu
04 2.7135: Install occupancy sensors $4,130 $8,000 $4,130
79,886
kWh
- -
05 2.6212: Turn off equipment during breaks, reduce operating time $6,137 $20 $6,137
118,704
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $3,573 $1,500 $3,125
60,446
kWh
$448
-
kW-mo/yr
-
07 2.2135: Repair and eliminate steam leaks $1,669 $100 - - $1,669
-
MMBtu
TOTAL RECOMMENDED $124,893 $142,860 $41,796
808,521
kWh
$3,436
-
kW-mo/yr
$79,661
-
MMBtu
TOTAL IMPLEMENTED $46,901 $85,860 $41,796
808,521
kWh
$3,436
-
kW-mo/yr
$1,669
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs