| Assessment Year | 2011 |
|---|---|
| Principal Product | Wire-mesh cable trays |
| NAICS | 332618: Other Fabricated Wire Product Manufacturing |
| SIC | 3496: Miscellaneous Fabricated Wire Products |
| Sales Range | $10 M to 50M |
| # of Employees | 70 |
| Plant Area |
76,120
ft2
|
| Annual Production | 500,000
pieces
|
| Production Hrs. Annual | 4,380
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $89,531 | 1,062,000 |
kWh
|
$0.084 |
| Electricity Demand | $24,062 | 3,000 |
kW-mo/yr
|
$8.02 |
| Electricity Fees | $6,858 | - |
|
- |
| Natural Gas | $6,272 | 766 |
MMBtu
|
$8.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,625 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,701 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,465 | $34,827 |
$14,465
171,586
kWh
|
- | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $1,656 | $2,150 |
$1,124
13,328
kWh
|
$532
-
kW-mo/yr
|
- | |
| 03 | 2.7135: Install occupancy sensors | $1,621 | $825 |
$989
11,734
kWh
|
$632
-
kW-mo/yr
|
- | |
| 04 | 2.7231: Use radiant heater for spot heating | $1,380 | $1,500 | - | - |
$1,380
-
MMBtu
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $888 | $1,000 |
$785
9,312
kWh
|
$103
-
kW-mo/yr
|
- | |
| 06 | 2.7134: Use photocell controls | $615 | $375 |
$277
3,285
kWh
|
$338
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $20,625 | $40,677 |
$17,640
209,245
kWh
|
$1,605
-
kW-mo/yr
|
$1,380
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,701 | $36,027 |
$15,731
186,605
kWh
|
$970
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs