Assessment Year | 2011 |
---|---|
Principal Product | Wire-mesh cable trays |
NAICS | 332618: Other Fabricated Wire Product Manufacturing |
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
76,120
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 4,380
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $89,531 | 1,062,000 |
kWh
|
$0.084 |
Electricity Demand | $24,062 | 3,000 |
kW-mo/yr
|
$8.02 |
Electricity Fees | $6,858 | - |
|
- |
Natural Gas | $6,272 | 766 |
MMBtu
|
$8.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,625 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,701 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,465 | $34,827 |
$14,465
171,586
kWh
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,656 | $2,150 |
$1,124
13,328
kWh
|
$532
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $1,621 | $825 |
$989
11,734
kWh
|
$632
-
kW-mo/yr
|
- | |
04 | 2.7231: Use radiant heater for spot heating | $1,380 | $1,500 | - | - |
$1,380
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $888 | $1,000 |
$785
9,312
kWh
|
$103
-
kW-mo/yr
|
- | |
06 | 2.7134: Use photocell controls | $615 | $375 |
$277
3,285
kWh
|
$338
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $20,625 | $40,677 |
$17,640
209,245
kWh
|
$1,605
-
kW-mo/yr
|
$1,380
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,701 | $36,027 |
$15,731
186,605
kWh
|
$970
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs