ITAC Assessment: SU0255
ITAC logo
ITAC Assessment: SU0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Heat Exchangers
NAICS 332410: Power Boiler and Heat Exchanger Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 178
Plant Area 110,930
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,264 3,213,502
kWh
Electricity Demand $111,116 7,496
kW-mo/yr
Electricity Fees $5,954 -
Natural Gas $139,206 12,358
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,105 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,806

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $9,744 - - - - - - $9,744
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,004 - $2,907
38,252
kWh
$1,097
-
kW-mo/yr
- - - -
03 4.821: Pay bills on time to avoid late fees $765 - - - - - - $765
04 2.4314: Use synthetic lubricant $336 - $247
3,244
kWh
$89
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,293 $1,300 $5,307
69,826
kWh
$1,986
-
kW-mo/yr
- - - -
06 2.7491: Insulate glazing, walls, ceilings, and roofs $8,489 $4,993 - - - $8,489
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $331 $237 $107
1,402
kWh
$30
-
kW-mo/yr
- - $141 $53
08 2.7496: Install partitions to reduce size of conditioned space $14,202 $19,571 - - - $14,202
-
MMBtu
- -
09 2.7243: Improve air circulation with destratification fans / other methods $4,084 $5,590 $(-402.0)
(-5,292)
kWh
$(-104.0)
-
kW-mo/yr
- $4,590
-
MMBtu
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $21,025 $32,224 $15,290
201,177
kWh
$5,735
-
kW-mo/yr
- - - -
11 2.6211: Conserve energy by efficient use of vending machines $269 $727 $269
3,533
kWh
- - - - -
12 2.3212: Optimize plant power factor $563 $3,344 - - $563 - - -
TOTAL RECOMMENDED $71,105 $67,986 $23,725
312,142
kWh
$8,833
-
kW-mo/yr
$563 $27,281
-
MMBtu
$141 $10,562
TOTAL IMPLEMENTED $21,806 $1,300 $8,214
108,078
kWh
$3,083
-
kW-mo/yr
- - - $10,509
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs