ITAC Assessment: BD0380
ITAC logo
ITAC Assessment: BD0380
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Fixtures and displays
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 134
Plant Area 312,000
ft2
Annual Production 287,000
pieces
Production Hrs. Annual 6,175
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,854 2,726,479
kWh
Electricity Demand $43,924 18,565
kW-mo/yr
Electricity Fees $25,302 -
Natural Gas $100,108 15,211
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,928

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.7135: Install occupancy sensors $15,800 $18,200 $12,293
155,610
kWh
$3,507
-
kW-mo/yr
- -
02 2.1223: Install smaller boiler (increase high fire duty cycle) $6,928 $11 - - $6,928
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $2,388 $3,780 $2,261
28,482
kWh
$127
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $1,681 $420 $1,564
19,694
kWh
$117
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $1,119 $1,500 - - $1,119
-
MMBtu
-
06 2.4314: Use synthetic lubricant $873 $600 $812
10,226
kWh
$61
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $748 $21 $696
8,772
kWh
$52
-
kW-mo/yr
- -
08 3.2123: Convert to high volume low pressure (hvlp) paint guns $1,554 $2,750 - - - $1,554
-
gal
TOTAL RECOMMENDED $31,091 $27,282 $17,626
222,784
kWh
$3,864
-
kW-mo/yr
$8,047
-
MMBtu
$1,554
-
gal
TOTAL IMPLEMENTED $6,928 $11 - - $6,928
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs