| Assessment Year | 2010 |
|---|---|
| Principal Product | Injection Molded Plastic Parts |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 65 |
| Plant Area |
50,000
ft2
|
| Annual Production | 200,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $74,532 | 1,747,009 |
kWh
|
$0.043 |
| Electricity Demand | $32,220 | 13,891 |
kW-mo/yr
|
$2.32 |
| Electricity Fees | $7,705 | - |
|
- |
| Natural Gas | $3,497 | 327 |
MMBtu
|
$10.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,290 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,052 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,866 | $25,159 |
$15,813
241,412
kWh
|
$1,053
-
kW-mo/yr
|
- | |
| 02 | 2.7135: Install occupancy sensors | $1,960 | $750 |
$1,790
38,243
kWh
|
$170
-
kW-mo/yr
|
- | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $329 | $410 |
$196
2,996
kWh
|
$9
-
kW-mo/yr
|
$124 | |
| 04 | 2.4133: Use most efficient type of electric motors | $2,981 | $7,700 |
$2,696
41,161
kWh
|
$285
-
kW-mo/yr
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,297 | $2,500 |
$1,217
18,575
kWh
|
$80
-
kW-mo/yr
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,857 | - |
$1,742
26,599
kWh
|
$115
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $25,290 | $36,519 |
$23,454
368,986
kWh
|
$1,712
-
kW-mo/yr
|
$124 | ||
| TOTAL IMPLEMENTED | $19,052 | $25,569 |
$17,751
271,007
kWh
|
$1,177
-
kW-mo/yr
|
$124 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs