ITAC Assessment: BD0368
ITAC logo
ITAC Assessment: BD0368
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Injection Molded Plastic Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 50,000
ft2
Annual Production 200,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,532 1,747,009
kWh
Electricity Demand $32,220 13,891
kW-mo/yr
Electricity Fees $7,705 -
Natural Gas $3,497 327
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,052

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,866 $25,159 $15,813
241,412
kWh
$1,053
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,960 $750 $1,790
38,243
kWh
$170
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $329 $410 $196
2,996
kWh
$9
-
kW-mo/yr
$124
04 2.4133: Use most efficient type of electric motors $2,981 $7,700 $2,696
41,161
kWh
$285
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $1,297 $2,500 $1,217
18,575
kWh
$80
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,857 - $1,742
26,599
kWh
$115
-
kW-mo/yr
-
TOTAL RECOMMENDED $25,290 $36,519 $23,454
368,986
kWh
$1,712
-
kW-mo/yr
$124
TOTAL IMPLEMENTED $19,052 $25,569 $17,751
271,007
kWh
$1,177
-
kW-mo/yr
$124
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs