ITAC Assessment: BD0362
ITAC logo
ITAC Assessment: BD0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Aerosol Dip Tubes
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3082: Unsupported Plastics Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 62,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,026 2,940,118
kWh
Electricity Demand $39,182 17,592
kW-mo/yr
Electricity Fees $14,316 -
Natural Gas $14,681 1,345
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,338

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,931 $36,000 $11,559
172,071
kWh
$420
-
kW-mo/yr
- $952
02 2.7142: Utilize higher efficiency lamps and/or ballasts $398 $325 $247
3,662
kWh
$11
-
kW-mo/yr
- $140
03 2.4221: Install compressor air intakes in coolest locations $701 $100 $659
9,776
kWh
$42
-
kW-mo/yr
- -
04 2.4314: Use synthetic lubricant $1,202 $300 $1,130
16,758
kWh
$72
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,945 $2,900 $1,828
27,121
kWh
$117
-
kW-mo/yr
- -
06 2.4133: Use most efficient type of electric motors $1,913 $3,300 $1,809
26,835
kWh
$104
-
kW-mo/yr
- -
07 2.2691: Shut off cooling if cold outside air will cool process $7,156 $60,000 $6,766
100,386
kWh
$390
-
kW-mo/yr
- -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $200 - - $200
-
kW-mo/yr
- -
09 2.3137: Use power during off-peak periods $15,684 $2,000 $14,211
210,834
kWh
$1,473
-
kW-mo/yr
- -
10 2.1121: Use insulation in furnaces to facilitate heating / cooling $2,248 $520 - - $2,248
-
MMBtu
-
TOTAL RECOMMENDED $44,378 $105,445 $38,209
567,443
kWh
$2,829
-
kW-mo/yr
$2,248
-
MMBtu
$1,092
TOTAL IMPLEMENTED $21,338 $43,445 $17,232
256,223
kWh
$766
-
kW-mo/yr
$2,248
-
MMBtu
$1,092
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs