ITAC Assessment: BD0354
ITAC logo
ITAC Assessment: BD0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Fabricated OEM parts
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 100,000
ft2
Annual Production 70,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,001 4,408,721
kWh
Electricity Demand $51,366 6,565
kW-mo/yr
Electricity Fees $88,049 -
Natural Gas $153,466 16,879
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,984 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,388 $80,292 $19,214
1,025
kWh
$2,584
-
kW-mo/yr
$(-3,410.0) -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $767 $1,100 $447
24
kWh
$52
-
kW-mo/yr
$268 -
03 2.7135: Install occupancy sensors $685 $1,816 $638
34
kWh
$27
-
kW-mo/yr
$20 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,005 - $5,230
279
kWh
$775
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $2,270 $1,500 $1,981
106
kWh
$289
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,132 $3,100 $13,155
701
kWh
$4,977
-
kW-mo/yr
- -
07 2.2437: Recover waste heat from equipment $13,322 $2,000 $8,215
438
kWh
$414
-
kW-mo/yr
- $4,693
-
MMBtu
08 2.1122: Re-size charging openings or add a movable door on equipment $24,415 - $24,415
3,101
kWh
- - -
TOTAL RECOMMENDED $83,984 $89,808 $73,295
5,708
kWh
$9,118
-
kW-mo/yr
$(-3,122.0) $4,693
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs