ITAC Assessment: BD0345
ITAC logo
ITAC Assessment: BD0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Sketchboards,Arthorse,Linoblocks,Pallets
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 13
Plant Area 24,000
ft2
Annual Production 61,712
lb
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,623 270,264
kWh
Natural Gas $12,783 1,267
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,387

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,896 $6,840 $2,896
111
kWh
- - -
02 2.7135: Install occupancy sensors $413 $725 $413
16
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $324 $550 $131
5
kWh
- $81 $112
04 2.4221: Install compressor air intakes in coolest locations $330 $300 $330
13
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,343 $1,000 $1,343
52
kWh
- - -
06 2.7231: Use radiant heater for spot heating $3,422 $10,592 - $3,422
-
MMBtu
- -
07 2.4314: Use synthetic lubricant $72 $100 $72
3
kWh
- - -
TOTAL RECOMMENDED $8,800 $20,107 $5,185
200
kWh
$3,422
-
MMBtu
$81 $112
TOTAL IMPLEMENTED $8,387 $19,382 $4,772
184
kWh
$3,422
-
MMBtu
$81 $112
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings