ITAC Assessment: BD0336
ITAC logo
ITAC Assessment: BD0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Animal feeds
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range less than $500
k
# of Employees 15
Plant Area 36,000
ft2
Annual Production 20,000
ton
Production Hrs. Annual 2,600
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,011 652,202
kWh
Electricity Demand $6,892 1,525
kW-mo/yr
Natural Gas $30,266 3,677
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,106 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $558

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.2437: Recover waste heat from equipment $106 $151 - - $106
-
MMBtu
- - -
02 2.4321: Upgrade obsolete equipment $226 $2 $172
2,599
kWh
$54
-
kW-mo/yr
- - - -
03 2.4221: Install compressor air intakes in coolest locations $95 $151 $72
1,086
kWh
$23
-
kW-mo/yr
- - - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $948 $1,001 - - $948
-
MMBtu
- - -
05 2.1221: Replace obsolete burners with more efficient ones $1,096 $2,501 - - $1,096
-
MMBtu
- - -
06 2.1222: Install turbulators $2,117 $2,501 - - $2,117
-
MMBtu
- - -
07 2.7111: Reduce illumination to minimum necessary levels $558 $151 $244
3,680
kWh
$249
-
kW-mo/yr
- - $26 $39
08 3.5217: Reuse / recycle/ sell paper products $1,960 $2 - - - $1,960
-
lb
- -
TOTAL RECOMMENDED $7,106 $6,460 $488
7,365
kWh
$326
-
kW-mo/yr
$4,267
-
MMBtu
$1,960
-
lb
$26 $39
TOTAL IMPLEMENTED $558 $151 $244
3,680
kWh
$249
-
kW-mo/yr
- - $26 $39
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs