ITAC Assessment: BD0319
ITAC logo
ITAC Assessment: BD0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product machined parts
NAICS 336419: Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
SIC 3769: Guided Missile Space Vehicle Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 77
Plant Area 128,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,649 2,273,772
kWh
Electricity Demand $15,633 6,624
kW-mo/yr
Natural Gas $13,060 1,193
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Water Consumption Savings
01 2.7111: Reduce illumination to minimum necessary levels $21,538 $875 $19,186
344,448
kWh
$1,303
-
kW-mo/yr
$1,049 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $403 $475 $337
6,058
kWh
$66
-
kW-mo/yr
- -
03 2.7134: Use photocell controls $328 $250 $251
4,517
kWh
$31
-
kW-mo/yr
$46 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,763 - $2,612
39,760
kWh
$151
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $876 $500 $820
14,730
kWh
$56
-
kW-mo/yr
- -
06 3.4151: Minimize water usage $1,153 $2,800 - - - $1,153
-
Tgal
TOTAL RECOMMENDED $27,061 $4,900 $23,206
409,513
kWh
$1,607
-
kW-mo/yr
$1,095 $1,153
-
Tgal
TOTAL IMPLEMENTED $24,301 $875 $21,798
384,208
kWh
$1,454
-
kW-mo/yr
$1,049 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs