Assessment Year | 2005 |
---|---|
Principal Product | Scrap Metal, Wood, and Paper Recycling |
NAICS | 331314: Secondary Smelting and Alloying of Aluminum |
SIC | 3341: Secondary Smelting and Refining of Nonferrous Metals |
Sales Range | $10 M to 50M |
# of Employees | 59 |
Plant Area |
60,000
ft2
|
Annual Production | 100,000
ton
|
Production Hrs. Annual | 2,730
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,474 | 468,731 |
kWh
|
$0.067 |
Electricity Demand | $1,134 | 3,196 |
kW-mo/yr
|
$0.35 |
Natural Gas | $25,295 | 2,780 |
MMBtu
|
$9.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,225 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,732 | $3,640 |
$2,639
39,312
kWh
|
$60
-
kW-mo/yr
|
- | $7 | $26 | |
02 | 2.7231: Use radiant heater for spot heating | $1,386 | $3,200 |
$73
1,220
kWh
|
$1
-
kW-mo/yr
|
$1,312
-
MMBtu
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $483 | $105 | - | - |
$483
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $485 | $143 |
$282
4,204
kWh
|
$6
-
kW-mo/yr
|
- | $40 | $157 | |
05 | 2.7135: Install occupancy sensors | $482 | $220 |
$468
6,974
kWh
|
$14
-
kW-mo/yr
|
- | - | - | |
06 | 2.2515: Use optimum thickness insulation | $432 | $210 | - | - |
$432
-
MMBtu
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $225 | $60 |
$220
3,275
kWh
|
$5
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $6,225 | $7,578 |
$3,682
54,985
kWh
|
$86
-
kW-mo/yr
|
$2,227
-
MMBtu
|
$47 | $183 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs