ITAC Assessment: BD0298
ITAC logo
ITAC Assessment: BD0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Basement Windows
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 32,000
ft2
Annual Production 94,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,570 266,388
kWh
Electricity Demand $5,538 2,556
kW-mo/yr
Electricity Fees $22,176 -
Natural Gas $22,529 2,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $1,476 $1,014 - - $1,476
-
MMBtu
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $988 $140 $825
19,014
kWh
$163
-
kW-mo/yr
- - - -
03 4.821: Pay bills on time to avoid late fees $902 - - - - - $902 -
04 2.7444: Close holes and openings in building such as broken windows $436 $1,200 - - $436
-
MMBtu
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $350 $350 $173
3,995
kWh
$12
-
kW-mo/yr
- $69 - $96
06 2.7447: Install vinyl strip / high speed / air curtain doors $202 $370 - - $202
-
MMBtu
- - -
07 2.4221: Install compressor air intakes in coolest locations $169 $300 $146
3,365
kWh
$23
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $4,523 $3,374 $1,144
26,374
kWh
$198
-
kW-mo/yr
$2,114
-
MMBtu
$69 $902 $96
TOTAL IMPLEMENTED $3,419 $3,004 $1,144
26,374
kWh
$198
-
kW-mo/yr
$1,912
-
MMBtu
$69 - $96
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs