ITAC Assessment: BD0296
ITAC logo
ITAC Assessment: BD0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Bronze Bushings
NAICS 332112: Nonferrous Forging
SIC 3369: Nonferrous Foundries, Except Aluminum and Copper
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 100,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 5,460
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $315,661 5,380,850
kWh
Natural Gas $64,615 7,845
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $218,708 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $217,285

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $10,610 $19,630 $10,609
190,809
kWh
$1
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,364 $9,710 $5,363
96,456
kWh
$1
-
kW-mo/yr
- - - -
03 2.7134: Use photocell controls $2,773 $1,800 $2,637
47,424
kWh
- - $26 - $110
04 2.7145: Install skylights $1,813 $1,472 $1,813
32,614
kWh
- - - - -
05 2.7135: Install occupancy sensors $1,793 $1,425 $1,589
28,528
kWh
- - $22 - $182
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,160 $600 $1,159
20,849
kWh
$1
-
kW-mo/yr
- - - -
07 2.4221: Install compressor air intakes in coolest locations $924 $500 $923
16,596
kWh
$1
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $846 $650 $481
8,655
kWh
$1
-
kW-mo/yr
- $150 - $214
09 2.4231: Reduce the pressure of compressed air to the minimum required $499 - $498
8,961
kWh
$1
-
kW-mo/yr
- - - -
10 3.1154: Use an alternative desulfurizing agent to eliminate hazardous slag formation $192,926 $3,000 - - $(-140,768.0)
-
lb
$(-13,000.0) $355,069 $(-8,375.0)
TOTAL RECOMMENDED $218,708 $38,787 $25,072
450,892
kWh
$6
-
kW-mo/yr
$(-140,768.0)
-
lb
$(-12,802.0) $355,069 $(-7,869.0)
TOTAL IMPLEMENTED $217,285 $38,287 $23,651
425,335
kWh
$4
-
kW-mo/yr
$(-140,768.0)
-
lb
$(-12,802.0) $355,069 $(-7,869.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs