ITAC Assessment: BD0294
ITAC logo
ITAC Assessment: BD0294
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Printed funeral related products
NAICS 511199: All Other Publishers
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 30,768
ft2
Annual Production 41,607,600
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,389 235,528
kWh
Electricity Demand $3,600 1,440
kW-mo/yr
Electricity Fees $1,522 -
Natural Gas $8,991 979
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,363 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $113,072

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Increase in Production Savings
01 2.6231: Utilize controls to operate equipment only when needed $7,821 $400 $7,821
78,341
kWh
- - -
02 2.7135: Install occupancy sensors $1,291 $750 $1,036
13,268
kWh
$255
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $599 $263 $599
6,023
kWh
- - -
04 4.441: Install automatic packing equipment $41,600 $22,000 - - $41,600 -
05 4.511: Expand operations into unused space $40,952 $20,000 - - - $40,952
06 4.513: Re-arrange equipment layout to reduce labor costs $13,260 $2,000 - - $13,260 -
07 4.513: Re-arrange equipment layout to reduce labor costs $8,840 $3,000 - - $8,840 -
TOTAL RECOMMENDED $114,363 $48,413 $9,456
97,632
kWh
$255
-
kW-mo/yr
$63,700 $40,952
TOTAL IMPLEMENTED $113,072 $47,663 $8,420
84,364
kWh
- $63,700 $40,952
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs