Assessment Year | 2005 |
---|---|
Principal Product | Greeting Card Display Fixtures |
NAICS | 337215: Showcase, Partition, Shelving, and Locker Manufacturing |
SIC | 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood |
Sales Range | $10 M to 50M |
# of Employees | 157 |
Plant Area |
315,000
ft2
|
Annual Production | 275,935
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $217,531 | 2,956,476 |
kWh
|
$0.074 |
Electricity Demand | $116,887 | 12,569 |
kW-mo/yr
|
$9.30 |
Natural Gas | $98,109 | 122,880 |
MMBtu
|
$0.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,248 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,894 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $13,639 | $248 |
$8,420
280,650
kWh
|
$5,219
-
kW-mo/yr
|
- | - | |
02 | 2.7135: Install occupancy sensors | $12,300 | $8,850 |
$5,205
173,486
kWh
|
$7,095
-
kW-mo/yr
|
- | - | |
03 | 2.7231: Use radiant heater for spot heating | $9,255 | $19,600 | - | - |
$9,255
-
MMBtu
|
- | |
04 | 2.2437: Recover waste heat from equipment | $4,137 | $1,500 |
$101
3,564
kWh
|
- |
$4,036
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,661 | $225 |
$235
7,823
kWh
|
$2,426
-
kW-mo/yr
|
- | - | |
06 | 2.2136: Install / repair insulation on steam lines | $1,900 | $150 | - | - |
$1,900
-
MMBtu
|
- | |
07 | 2.1222: Install turbulators | $1,486 | $2,500 | - | - |
$1,486
-
MMBtu
|
- | |
08 | 2.3132: Recharge batteries on during off-peak demand periods | $146 | - |
$73
3,084
kWh
|
$73
-
kW-mo/yr
|
- | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $894 | $2,500 |
$218
7,266
kWh
|
$676
-
kW-mo/yr
|
- | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $658 | - |
$367
12,220
kWh
|
$291
-
kW-mo/yr
|
- | - | |
11 | 2.4221: Install compressor air intakes in coolest locations | $568 | $440 |
$168
5,586
kWh
|
$400
-
kW-mo/yr
|
- | - | |
12 | 2.4314: Use synthetic lubricant | $564 | $600 |
$314
10,474
kWh
|
$250
-
kW-mo/yr
|
- | - | |
13 | 3.5316: Contract a wood pallet recycling company | $1,040 | $140 | - | - | - |
$1,040
-
lb
|
|
TOTAL RECOMMENDED | $49,248 | $36,753 |
$15,101
504,153
kWh
|
$16,430
-
kW-mo/yr
|
$16,677
-
MMBtu
|
$1,040
-
lb
|
||
TOTAL IMPLEMENTED | $34,894 | $24,963 |
$9,728
325,081
kWh
|
$8,935
-
kW-mo/yr
|
$15,191
-
MMBtu
|
$1,040
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs