ITAC Assessment: BD0285
ITAC logo
ITAC Assessment: BD0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Bed Frames
NAICS 337124: Metal Household Furniture Manufacturing
SIC 2514: Metal Household Furniture
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 125,000
ft2
Annual Production 225,000
pieces
Production Hrs. Annual 3,770
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,439 1,855,425
kWh
Electricity Demand $11,049 5,321
kW-mo/yr
Electricity Fees $6,368 -
Natural Gas $70,127 7,571
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,090 $2,695 $2,289
47,486
kWh
$570
-
kW-mo/yr
- $79 $152 -
02 2.4133: Use most efficient type of electric motors $2,976 $4,080 $2,617
54,299
kWh
$359
-
kW-mo/yr
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,695 - $1,357
28,163
kWh
$338
-
kW-mo/yr
- - - -
04 2.7135: Install occupancy sensors $995 $675 $719
14,914
kWh
$276
-
kW-mo/yr
- - - -
05 2.4221: Install compressor air intakes in coolest locations $487 $900 $330
6,827
kWh
$157
-
kW-mo/yr
- - - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $488 - - $488
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $370 $360 $193
3,995
kWh
$11
-
kW-mo/yr
- $69 $97 -
08 3.5316: Contract a wood pallet recycling company $11,600 $480 - - $11,600
-
lb
- - -
09 3.4151: Minimize water usage $3,135 $1,320 - - - - - $3,135
-
Tgal
10 4.632: Change operating conditions $2,898 $2,500 - $2,898
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $27,734 $13,010 $7,505
155,684
kWh
$5,097
-
kW-mo/yr
$11,600
-
lb
$148 $249 $3,135
-
Tgal
TOTAL IMPLEMENTED $20,706 $8,515 $6,786
140,770
kWh
$1,923
-
kW-mo/yr
$11,600
-
lb
$148 $249 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs