Assessment Year | 2005 |
---|---|
Principal Product | Bed Frames |
NAICS | 337124: Metal Household Furniture Manufacturing |
SIC | 2514: Metal Household Furniture |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
125,000
ft2
|
Annual Production | 225,000
pieces
|
Production Hrs. Annual | 3,770
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $89,439 | 1,855,425 |
kWh
|
$0.048 |
Electricity Demand | $11,049 | 5,321 |
kW-mo/yr
|
$2.08 |
Electricity Fees | $6,368 | - |
|
- |
Natural Gas | $70,127 | 7,571 |
MMBtu
|
$9.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,734 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,706 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,090 | $2,695 |
$2,289
47,486
kWh
|
$570
-
kW-mo/yr
|
- | $79 | $152 | - | |
02 | 2.4133: Use most efficient type of electric motors | $2,976 | $4,080 |
$2,617
54,299
kWh
|
$359
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,695 | - |
$1,357
28,163
kWh
|
$338
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7135: Install occupancy sensors | $995 | $675 |
$719
14,914
kWh
|
$276
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $487 | $900 |
$330
6,827
kWh
|
$157
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $488 | - | - |
$488
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $370 | $360 |
$193
3,995
kWh
|
$11
-
kW-mo/yr
|
- | $69 | $97 | - | |
08 | 3.5316: Contract a wood pallet recycling company | $11,600 | $480 | - | - |
$11,600
-
lb
|
- | - | - | |
09 | 3.4151: Minimize water usage | $3,135 | $1,320 | - | - | - | - | - |
$3,135
-
Tgal
|
|
10 | 4.632: Change operating conditions | $2,898 | $2,500 | - |
$2,898
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $27,734 | $13,010 |
$7,505
155,684
kWh
|
$5,097
-
kW-mo/yr
|
$11,600
-
lb
|
$148 | $249 |
$3,135
-
Tgal
|
||
TOTAL IMPLEMENTED | $20,706 | $8,515 |
$6,786
140,770
kWh
|
$1,923
-
kW-mo/yr
|
$11,600
-
lb
|
$148 | $249 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs