Assessment Year | 2008 |
---|---|
Principal Product | Marine Propulsion Stern Drives |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3519: Internal Combustion Engines, Not Elsewhere Classified |
Sales Range | greater than $500 M |
# of Employees | 1,000 |
Plant Area |
700,000
ft2
|
Annual Production | 75,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,299,341 | 45,665,000 |
kWh
|
$0.050 |
Natural Gas | $1,547,495 | 211,838 |
MMBtu
|
$7.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $525,135 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $466,727 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $164,842 | $297,920 |
$164,842
3,296,841
kWh
|
- | |
02 | 2.7145: Install skylights | $14,224 | $54,912 |
$14,224
284,482
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $48,433 | $104,000 |
$48,433
968,651
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,975 | $8,646 |
$9,975
199,496
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $31,605 | $1,000 |
$31,605
672,615
kWh
|
- | |
06 | 2.2442: Preheat combustion air with waste heat | $238,891 | $232,766 | - |
$238,891
-
MMBtu
|
|
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $17,165 | - |
$17,165
343,309
kWh
|
- | |
TOTAL RECOMMENDED | $525,135 | $699,244 |
$286,244
5,765,394
kWh
|
$238,891
-
MMBtu
|
||
TOTAL IMPLEMENTED | $466,727 | $586,598 |
$227,836
4,597,247
kWh
|
$238,891
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs