ITAC Assessment: OK0762
ITAC logo
ITAC Assessment: OK0762
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Marine Propulsion Stern Drives
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range greater than $500
M
# of Employees 1,000
Plant Area 700,000
ft2
Annual Production 75,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,299,341 45,665,000
kWh
Natural Gas $1,547,495 211,838
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $525,135 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $466,727

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $164,842 $297,920 $164,842
3,296,841
kWh
-
02 2.7145: Install skylights $14,224 $54,912 $14,224
284,482
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $48,433 $104,000 $48,433
968,651
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,975 $8,646 $9,975
199,496
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $31,605 $1,000 $31,605
672,615
kWh
-
06 2.2442: Preheat combustion air with waste heat $238,891 $232,766 - $238,891
-
MMBtu
07 2.6212: Turn off equipment during breaks, reduce operating time $17,165 - $17,165
343,309
kWh
-
TOTAL RECOMMENDED $525,135 $699,244 $286,244
5,765,394
kWh
$238,891
-
MMBtu
TOTAL IMPLEMENTED $466,727 $586,598 $227,836
4,597,247
kWh
$238,891
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs