Assessment Year | 2005 |
---|---|
Principal Product | Decorative Packaging for the Floral Industry |
NAICS | 339999: All Other Miscellaneous Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
175,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $172,681 | 2,237,760 |
kWh
|
$0.077 |
Natural Gas | $42,471 | 6,583 |
MMBtu
|
$6.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,998 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,944 | $7,408 |
$14,004
181,397
kWh
|
- | - | $940 | - | |
02 | 2.7231: Use radiant heater for spot heating | $7,491 | $6,000 |
$2,506
29,768
kWh
|
$4,985
-
MMBtu
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,406 | - |
$5,406
70,032
kWh
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,725 | $200 |
$1,725
22,344
kWh
|
- | - | - | - | |
05 | 2.7135: Install occupancy sensors | $1,418 | $675 |
$1,418
18,370
kWh
|
- | - | - | - | |
06 | 2.6214: Shut off pilots in standby equipment | $964 | - | - |
$964
-
MMBtu
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $631 | $450 |
$411
5,326
kWh
|
- | $92 | $128 | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $516 | $300 |
$516
6,687
kWh
|
- | - | - | - | |
09 | 3.4151: Minimize water usage | $903 | $1,320 | - | - | - | - |
$903
-
Tgal
|
|
TOTAL RECOMMENDED | $33,998 | $16,353 |
$25,986
333,924
kWh
|
$5,949
-
MMBtu
|
$92 | $1,068 |
$903
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs