ITAC Assessment: BD0281
ITAC logo
ITAC Assessment: BD0281
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Decorative Packaging for the Floral Industry
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 175,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $172,681 2,237,760
kWh
Natural Gas $42,471 6,583
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,944 $7,408 $14,004
181,397
kWh
- - $940 -
02 2.7231: Use radiant heater for spot heating $7,491 $6,000 $2,506
29,768
kWh
$4,985
-
MMBtu
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,406 - $5,406
70,032
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,725 $200 $1,725
22,344
kWh
- - - -
05 2.7135: Install occupancy sensors $1,418 $675 $1,418
18,370
kWh
- - - -
06 2.6214: Shut off pilots in standby equipment $964 - - $964
-
MMBtu
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $631 $450 $411
5,326
kWh
- $92 $128 -
08 2.4221: Install compressor air intakes in coolest locations $516 $300 $516
6,687
kWh
- - - -
09 3.4151: Minimize water usage $903 $1,320 - - - - $903
-
Tgal
TOTAL RECOMMENDED $33,998 $16,353 $25,986
333,924
kWh
$5,949
-
MMBtu
$92 $1,068 $903
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs